15 November 2018 - 10:53am by Katie Hart

The renovation is well underway! Demolition is completed, however that doesn’t mean the end of the noise. Be sure to grab a pair of earplugs at the circulation desk if you need them. The progress may not look like much now, but trust us, there will be beautiful and useful spaces come June. In the meantime, enjoy a behind-the-scenes peek at what is going on behind those renovation barriers. 

 

Renovation photo

The former information room has been gutted and is slowing becoming a flexible 125-seat teaching and learning commons. 

 

Renovation photo

Heading downstairs, this picture is taken from the middle of the new information commons, looking toward the stairs and the future enlarged faculty video production studio.

 

Renovation photo

The left of this picture shows where two new meeting rooms will be and to the right is the future location of the Information Desk.

 

Renovation photo

Did you know that the library’s bookshelves help hold up the ceiling? In order to remove the stacks, a steel superstructure was added on the E-level to keep the first floor Morse Reading Room exactly where it is! You’re looking at the location of six new classrooms and two group study rooms.

 

Renovation photo

Standing in the future doorway of a group study room, imagine study space ahead and classrooms on the right.

 

 

Demolition Begins!

11 September 2018 - 11:54am by Katie Hart

Renovation partition walls have been built throughout the library and construction is officially underway! The library has been lucky so far in the noise department, however expect a large uptick in the overall construction noise during the weeks of September 17 and 24. Demolition will begin and construction noise will inevitably be disruptive in certain parts of the library. Construction ends before 3pm daily, so if you need some peace and quiet to study, try us in the evening. Apologies in advance for the inconvenience this will cause.

If you haven't already done so, consider signing up for the Hard Hat Harvey list-serv for the most up to date information about the renovation and current coniditons in the library. We will keep the emails to a minimum, but still keep you informed of renovation progress. We also keep a list of Frequently Asked Questions with current information about the renovation.

Construction Begins!!

29 August 2018 - 8:09am by Kelly Perry

At last!  Wednesday, August 29th, construction begins.  The first item on the agenda is partition installation, which separates the library from the areas under renovation.  It will be noisy and disruptive at times during the coming months.  We apologize in advance for the inconvenience.

Complimentary pairs of earplugs available at the Circulation Desk.

 

 

 

 

Reno-relocation

9 August 2018 - 3:00pm by Kelly Perry

If you haven't stopped by the library recently you may notice that things are a bit...  different.  We have optimized the spaces that will not be part of the renovation project for your comfort and convenience. 

What does that mean for you?  Can you still access the all-important things the library offers, such as study materials, computers...  the bathrooms?  Of course you can! 

Map of the library during renovations

Here we have a map of the layout of the library during the renovations (click this link to view the map as a .PDF).  We'll soon have additional signage and other guides to help you find your way during these first few months of the construction.  Of course, please feel free to ask any staff member to help you at any time.

We are grateful for your patience during this time, and look forward to the exciting collaborations this renovation will bring!

Furniture Moving

2 August 2018 - 11:29am by Kelly Perry

We will be moving furniture on Friday the 3rd, Monday the 6th, and Tuesday the 7th from 7:30am to 3pm.  The movers will be transferring furniture from all parts of the library as we wrap up our preparations for renovation.

Expect disruptions, possible room closures, and lots of activity during these times.

We apologize for any inconvenience.

Movers relocate furniture in the Morse Reading Room.Movers relocate furniture in the Morse Reading Room.

 

 

 

 

 

 

 

 

 

 

 

 

Renovation prep begins Monday, July 30th

26 July 2018 - 10:36am by Kelly Perry

Beginning Monday, July 30, you will notice an increase in noise and disruption at the Cushing/Whitney Medical library as work begins to prepare the space for the renovation project.

On Monday, the Information Desk and staff will be relocated to the Circulation Desk area at the front of the library.

Also on Monday, movers will be on site to relocate and remove furniture in advance of construction.  They will be moving tables and other furniture throughout all floors of the library.  These moves will occur over the course of the day and there will be noise associated with this work, especially between the Information Room and Morse Reading Room.  This work will require the temporary removal and/or relocation of computer workstations.

If you require quiet study space, please consider another location during this time.

To stay informed of renovation news, please sign up for the HHH email list.  You’ll be the first to know of the latest news related to the renovation project and its effect on library services.

Questions and comments can be sent to https://library.medicine.yale.edu/renovation/contact.

Noise Alert for Friday, July 13th and Saturday, July 14th

13 July 2018 - 12:11pm by Kelly Perry

Basement stacks, where drilling will take place.

Workers will be in the library this afternoon and tomorrow to install additional electrical service in preparation for the renovation project.  This work will take place near the four pillars on the E-level next to the book stacks.  This work may be noisy and library users may want to seek other space in the library during this time.

The work is slated to take place today (Friday, 7/13) from 4pm until approximately 10pm and tomorrow (Saturday, 7/14) from 7am to 3pm.  We apologize for this necessary inconvenience and appreciate your patience as we begin the renovation project.

Please contact Judy Spak (judy.spak@yale.edu) with any questions.

The Betsey Cushing Study Rooms

3 July 2018 - 8:29am by Kelly Perry

As the countdown towards renovations ticks down, you unfortunately will no longer be able to reserve a study room in the basement of the library.  Because we know these study rooms will have to be closed in the very near future, we decided it was best to end the capability to reserve the rooms online now, since future reservations may end up having to be cancelled.

The good news is that the rooms are still available on a first come, first served basis, until such time where the area is closed off to all patrons because of renovations.

We apologize for the inconvenience.  While we await the day the renovations are complete, and more glorious study space opens up, please note the availability and locales of other study spaces around campus by visiting this link here.